The suspension system is floorboard of the connection device between the frame and wheel axle or all the force, its function is to transfer function between the wheel and the frame of force and moment, and buffer by the uneven road surface to the impact of the frame or body, and the attenuation of the resulting vibration, in order to make sure the car was going smoothly.
In general, the automobile suspension system can be divided into the independent suspension and independent suspension, the independent suspension of the wheels on both ends of a whole axle, when the wheel side beat the other side wheels also beat accordingly, make whole body vibration or inclination;Independent suspension axle is divided into two sections, each wheel under the spiral spring independent by the installation of the frame, when the side wheels to beat the other side of the wheel is not affected, can the wheels on both sides of the independence movement, improve the stability and comfort of a car.As people demand for the car ride comfort and manipulation stability becomes more and more high, the independent suspension system already was washed out gradually
Suspension Parts,Aluminum Die Casting Hanger Bracket,Aluminum Die Casting Body Side Bracket,Hanger Bracket NINGBO ZHENHAI BOLANG METAL PRODUCT FACTORY , https://www.diecastingdie.com
Shanchuan Heavy Industry won the 1+1 drilling platform cantilever beam reconstruction project contract
Recently, the contract of the 1+1 “HY92†series jack-up drilling platform cantilever beam reconstruction project undertaken by Shanhai Heavy Industry Marine Engineering Co., Ltd. came into effect.
The series of platforms are affiliated to CCS and ABS classification societies with a total length of 57.2 meters, a width of 53.34 meters, a depth of 7.62 meters and a total length of 94 meters. The purpose of this transformation is to improve the drilling operation capacity and operation effect. The project includes cantilever beam lengthening, cantilever beam movement, follow-up device modification, and punch pile pipeline reconstruction. The project is expected to add 160 tons of new steel structure. 1200 meters, replace the cable 12125 meters. Among them, the “Offshore Oil 922†drilling platform is expected to enter the factory in January next year. The current design, equipment and materials procurement, and new prefabrication are being carried out in an orderly manner. The undertaking of the platform reconstruction project will accumulate valuable experience for various modification and construction projects of similar products, and enhance the brand effect of the company in the field of marine engineering project modification and construction.